Skip to content
Brand Key Advertising

Signage & Facades

Installation, which is what decides how long a sign lasts

Frames
5
Service
Signage & Facades
A shopfront after its illuminated fascia band was installed, with white Arabic and Latin lettering on a dark ground.

Swipe to browse the frames

Installation is the part a customer never sees and the part that decides whether the sign stays where it was put. Our rule is that as little as possible happens on site: the survey is taken from the building, fabrication finishes in the workshop, and site is lifting, fixing and power only. The less that happens on site, the less can go wrong and the less time the shop stays shut.

The fixing changes with what is behind it rather than with the sign. On glazing the load goes into the structural frame, never into the pane. On stone the letters sit on a concealed sub-frame that absorbs the variation, because stone is never flat and cannot be drilled just anywhere. Exterior concrete takes chemical anchors rather than plugs. Timber gets fixings detailed to allow movement rather than resist it, or the letters start to sit crooked within a year.

And we install with the scaffold still up when that is what it takes — which is the normal case, not the exception. Signage goes on before the fit-out finishes so the tenant opens on the date he has, because every day an opening slips is a cost to him rather than to us.

How it is made

The frontage is the first thing a customer sees and often the last thing they remember. We deliver the whole sign — illuminated letters, fascia band, cladding, and the installation itself — and maintain it afterwards. Materials are chosen for the facade and the viewing distance, not for the lowest quote.

More on Signage & Facades →

More in this category